The performance of FlatStation 7 Series units has been tested to the Building Engineering Services Association’s UK test standard for heat interface units.
FlatStation 7 Series HIUs have been designed to take up less space than traditional HIUs and offer a variety of pipework connection options to maximise siting options and facilitate trouble-free installation.
In addition to their energy saving features, FlatStation 7 Series HIUs reduce environmental impact by reducing scrap in the manufacturing process by 30% and using less energy on brazing, as well as having 24% less expanded polypropylene. All components and the enclosure are made from recyclable materials.
The winners of the CIBSE Building Performance Awards 2018 will be announced at a gala dinner at Grosvenor House Park Lane on 6th February 2018.
Further information about FlatStation heat interface units